Restructured the history of alimentation, reducing the space occupied on disk, increasing the accuracy of traceability and improving performance of access to history
New visualization of the historical in three steps (faithful to the new internal structure): plan of alimentation generated, data of the tanks at the moment in which it has been created and sent the plan, detail of each feeding dose per tank and plan. The previous display of historical grouped by natural day is maintained, with the relevant adjustments to the new structure
Updating feed reports to historical storage structural changes
The option “Data Feeder” is now called “Planning”
Updating the feeding plan submission process: thanks to the new structure, tank data necessary for traceability are stored at the moment the plan is created and sent (instead of during the reading), generating a plan entry of power in the historical at that time, which is marked as ‘not processed’, and is subsequently updated during the process of reading the plan executed by the machine (when it is marked as ‘processed’ and details of the result are stored ). This new order incorporates new verifications, which allow to have more control, precision, and detection of problems
Updated “Planning” interface with the new instructions of the sending process: now there is ‘save plan sent’ and ‘save plan read’ instead of a single save button of history
The historical dose detail now stores the calculated shot time
It has been renamed “pools” as “tanks”
Support to record the levels of oxygen, pH and turbidity of each tank
Support for the “Oxywifi” sensor for automatic reading of temperature, pH and oxygen
New SCADA interface, which allows to visualize the state of the machine from a single place, indicating us
• alerts and active alarms
• Current levels of temperature, oxygen, pH and turbidity
• feeding plan in progress showing the current and next dose
• state of the silos
• times and errors of the last automatic update and the time when the following was scheduled
• air pressure levels (or blowing speed, depending on the type of machine)
Review of several error messages, more descriptive
Improvements in the interface with new iconography, reorganization of keypad in Configuration and other minor details
Support for new type of machine (‘Large’) with a capacity of feed by higher dose, and as a consequence, a number
Added possibility to specify the “feed priority” of each tank manually. This affects how the feeding plan executed by the machine is ordered: it is ordered according to the time (as above), for coinciding hours it is sorted according to the priority and, failing that, by the hose number.
Improved the Food Plan History window with:
• Visualization of the plan and tanks currently selected (in Tanks and Doses tabs)
• By default, the Dosage table shows the complete feeding plan
• A new button allows to toggle between all the doses of the plan and only the doses of the selected tank
Added: in Configuration, the possibility of applying the default values of tanks to all existing ones in a single click; it is done individually for each piece of data (feeding, distribution, conversion, species, surface) in the same way as it was previously allowed with temperature. The species selection automatically selects the most current batch
Added: in Configuration, the default Tank Status option, and also includes a button to apply that value to all existing tanks.